Message from @Vanguard
Discord ID: 309033753446187018
it has to go through a design build process
and they are starting wall refab with "maintainence" of existing sections
fencing going to 20ft tall steel
The wall shall prevent digging or tunneling below it for a minimum of 6 feet below the lowest
adjacent grade.
5) The wall shall prevent/deter for a minimum of 30 minutes the creation a physical breach of the wall
(e.g., punching through the wall) larger than 12-inches in diameter or square using sledgehammer,
car jack, pick axe, chisel, battery operated impact tools, battery operated cutting tools,
Oxy/acetylene torch or other similar hand-held tools.
6) The north side of wall (i.e. U.S. facing side) shall be aesthetically pleasing in color, anti-climb
texture, etc., to be consistent with general surrounding environment. The
manufacturing/construction
As part of the security requirement, the Contractor shall be responsible for the development of a
Security Plan in conjunction with the Health and Safety Plan. The detailed Security Plan shall include
details such as, but not limited to; "fall back positions," evacuation routines and methods, muster area,
medical staff members/availability, number of security personnel, qualifications, years of experience,
etc. in the event of a hostile attack. This plan shall be reviewed by Contracting Officer’s Representative
for inspection and final acceptance prior to construction activities. The Contractor shall bring three (3)
copies of the security plan to the pre-construction conference.
Additional Security requirements may be required in future task orders.
prepping for lib shits to move the site lolol or beans
mob*
thanks
Would there be any objection to incorporating patented Israeli technologies?
3
Answer: Per the RFP, prototype designs shall not include the use of proprietary design or equipment. Offerors shall comply with all
Section L Phase I and Phase II Submission Instructions.
LOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOL
CAN WE USE ISRAELI TECH
"no"
tough luck schlomo
LOL will the government accept a non physical wall and combination of sensors etc
"no"
Will barbed wire, or razor ribbon, or spikes, be acceptable for the top of the fence, to prevent climbing? I
LMAOOOO
dude this is a HUEG white pill
I'm ODing
call mcnabb
SPIKES ARE IN PLAY LADS
(2) The Contractor shall use only domestic, or designated country construction material other than Bahrainian,
Mexican, or Omani construction material in performing this contract, except as provided in paragraphs (b)(3)
and (b)(4) of this clause.
(3) The requirement in paragraph
MEXICO MANUFACTURING BTFO
MUDSLIMES BTFO
yeah i was confused by people saying the wall wasnt happening. i had an interview for a company that got a huge contract related to securing the wall
weeks ago
If we provide a contact for the entire team are we at liberty to keep the individual personnel names confidential until after the Phase II
submission to protect our employees from potential media backlash?
Answer: The contractor is to identify in their proposal the “Key Personnel” as required. This information is procurement sensitive and
will not be released.
Ha
OOOOOOOOY VEEEY
I am high on white pill now tbh
wow white sharia is powerful it even turns you white
lol lib shit posted some sweeping thought on how president and vp et al will be impeached
(citation needed)
he deletes post
Hillary Clinton blames Russian hackers, FBI's Comey for 2016 election defeat in her first extensive remarks about the loss
“If the election had been on October 27, I would be your president,” Clinton said, calling herself "part of the resistance" to President Trump. After spending the past six months in relative hibernation, she made a rare public appearance at a Women for Women event in New York. Clinton repeatedly ribbed President Trump in the interview, leaving no doubt that she disapproves of both his policy decisions and personal conduct in office.
she disapproves?? who knew