Message from @Lios
Discord ID: 616011770254852096
yup
You mean just the spindling the wires around the cores?
6 months for the big boi power station transformers
@JackH670 no
That's a lotta werk
guys, I've figured it out
yeah, we are talking a shit ton of copper and epoxy
**lets do standard ass ads next to porn**
why not
A lot of work that has to be done carefully and with precision
i want to see
yup
a Boba Bola ad
next to my double team action
I just pictured one of those transformer fires
>> 6 months of work on fire
yeah, those things are no joke
that's the danger of an EMP or CME
I am sure some workers have extreme feels watching it bern
won't be an easy thing to replaces them by the 1000s
A substation blew up near here a couple years ago. Dunno the cause, but damn thing sounded like a couple of bombs went off.
Get a home generator forehead
I have witnessed transformer fires in Russia
They happen every winter
yeah, that kinda power is equivalent to about 10 locomotives derailing
it's especially bad in areas where they don't have adequate protection installed
Ugh I need to get back to swimming again
Or half-ass the maintenance
yup
and i have known guys killed by switchgear malfunction
100MVA
That's nothing
One of my childhood friends once crawled into an electric booth and got zapped there
Severe burns across the back, but he survived
closing a breaker between two 25kW generators 180 deg out of phase... BOOM
He didn't even touch anything, it just arked across him
turns a 4 ton breaker into a missle
To his luck it turned off as soon as it arked, as the disconnect blew off as it should
Right I have a question